guard: sync test baseline with PR #6 rows #8

Merged
PerishFire merged 1 commit from guard/baseline-test-sync into main 2026-07-14 11:55:44 +00:00
Owner

Approved arithmetic correction: test-track baseline was stale by the four rows PR #6's regression test added; synced from a fresh measured scan (test 491/unique 401, total 2057). Process lesson banked: baselines are written from measurement, never from expected numbers.

Approved arithmetic correction: test-track baseline was stale by the four rows PR #6's regression test added; synced from a fresh measured scan (test 491/unique 401, total 2057). Process lesson banked: baselines are written from measurement, never from expected numbers.
guard: sync test baseline with PR #6 rows
All checks were successful
guard / guard (pull_request) Successful in 2m35s
b66679c223
Liberte-approved arithmetic correction: the regression test landed as
PR #6 added four test-track rows (its fn name + three santi_core
use-path tokens) before the I-1 baseline was written from ruling
numbers instead of a fresh scan. test 487 -> 491 (unique 401),
total 2053 -> 2057; wire/internal/core untouched. Written from the
measured scan this time.

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
PerishFire deleted branch guard/baseline-test-sync 2026-07-14 11:55:44 +00:00
Sign in to join this conversation.
No reviewers
No labels
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference
PerishFire/santi!8
No description provided.